Organize a project
This is the back-office playbook for setting up a job: create the project, fill in its details, add its people and documents, break it into site work phases if you use them, and track it on the Projects workspace. It's written for anyone working in Offload on a computer.
New to projects? See Projects for what a job is and Site work and phases for how site work phases work.
Create the project
You can start a project on its own, or create one without leaving the load dialog.
- 1
Open Create Project
Go to Projects (/projects) and choose to add a project. This opens the Create Project modal. - 2
Or create it inline while adding loads
In the Add Loads dialog you can create a new project without leaving it. This is handy when you're setting up a job's first loads. See Creating a load for that flow.
Fill in the job's details
Give the job everything it needs. Its people and documents flow down to every load under it, and its default locations become quick picks when you set locations on those loads.
- 1
Set the Project ID / Job number
If your organization has job numbering on, this is pre-filled with the next number. Leave it to accept it, or type your own. See Set up job numbering. - 2
Pick the customer and branch
Choose the customer (optional) and the branch that owns the job. - 3
Assign the project manager
Choose the person accountable for the job. - 4
Add a color and description
Pick a color to tag the job across the app, and add a description if it helps. - 5
Set the default job-site locations
Add a default pickup and dropoff. They are not forced onto loads. They show up as quick picks in the location picker when you set locations on the job's loads and site work phases, so you don't retype them. - 6
Save
Create the project. It's now on the Projects page.
Add people and documents
Anything you attach to the job flows down to its loads, so add it once here.
- 1
Add project members
On the project, open the People tab and add the people who should have access to the job. If a person has an Offload login, membership gives them read-only access to the project and its loads (the project manager gets manage access). This records access, not crew: crew is assigned to site work phases on the Dispatch board. - 2
Attach project documents
Upload documents that apply to the whole job. They appear on every load under the project, tagged "Project" and read-only there, so one upload covers all the loads.
Add site work
If your organization has the Site work feature enabled, break the job into site work phases. Skip this for a loads-only job.
- 1
Open the project and find Site work
On the project page, the Site work table lists the job's phases. Choose "Add phase" to open the phase editor. - 2
Set the phase site and dates
Give the phase its job site (origin and destination) and its target start and end dates. - 3
Set crew requirements
Add the crew types and quantities the phase needs. Crew is fulfilled per scheduled day. - 4
Set equipment requirements
Add the equipment the phase needs on site. Equipment is fulfilled by presence, through mobilization and demobilization (mob/demob) loads. - 5
Save, or Save and add another
Save the phase. Use "Save and add another" to enter the next phase without reopening the editor.
Declaring a phase's requirements is planning. Scheduling phases onto dates and assigning real crew and equipment happens on the Dispatch board, a separate step. See Site work and phases.
Track your jobs on the workspace
The Projects page is a saved-views workspace, so you can shape it to the jobs you care about.
- 1
Filter, group, and sort
Narrow to the jobs you want, group them (by status or customer, for example), and sort them. Each row shows load count, customer, origin, destination, and status. - 2
Save the view
Save the shape as a view so you can switch back to it any time. See Build and save a view.