Manage your fleet, team, and partners
Run this workflow when you are setting up your roster or bringing on something new: a truck, a driver, or a partner company. Everything here lives in the Resources section of the left navigation. The reference for each page is the Resources overview.
Set up your resource types
Types are the vocabulary jobs use to ask for resources ("2 riggers and a crawler crane"), so define them first.
- 1
Open Settings
Go to Settings and find Resource Types. - 2
Add the types you dispatch by
Create person types (Crane operator, Rigger, Escort driver), truck types (Heavy-haul tractor, Twin-steer), trailer types (Lowboy, 13-axle steerable), and equipment types (Crawler crane, Pilot car). - 3
Check them on the Types tabs
Assets and People each have a Types tab that lists what you defined.
Add your fleet
- 1
Go to Assets
Open Assets in the left navigation. - 2
Add each asset
Click "Add asset" and choose Truck, Trailer, or Equipment. Fill in the unit number and details. - 3
Set ownership
In the form, mark the asset in-house (your company or a branch) or external (pick the partner company that owns it). - 4
Give it a type
Assign the resource type so requirements can find it.
Add your people
- 1
Go to People
Open People in the left navigation. - 2
Add each person
Click "Add person". The form's toggle decides internal team member or external individual. - 3
Give them a dispatch role
A person's dispatch role is their person resource type (Driver, Crane operator, Rigger). It's what shows in the roster's Role column and what crew requirements match against.
Add and connect partner companies
- 1
Go to Partners
Open Partners in the left navigation. - 2
Add the company
Click "Add company", pick the type (customer, carrier, vendor), and optionally add a first contact in the same step. - 3
Connect when you want to share
Click "Connect" on the row (or "Invite partner") to send a connection invitation. Once accepted, you can share loads with them.
Check availability before you commit
- 1
Open the Availability tab
On Assets or People, switch to the Availability tab (or go straight to/assets?tab=availability). - 2
Pick your window
Set the date range you are planning (up to 45 days). - 3
Read the grid
Each type group shows how many are free each day. Blue bands are load assignments; on-site bands show site-work presence. - 4
Assign from Dispatch
When you know who is free, fill the crew and equipment slots on the Dispatch board.
Was this helpful?